Dimmitt Hall Remodel

Dimmitt Hall Remodel 7-27-15 (42 of 81)-2

Second floor is in it’s finally stages.

The Dimmitt Hall renovation is almost finished. The final coats of paint in the dorm halls are finished, floors are being cleaned, and wires are being run for Internet access. The furniture will be coming soon. Students are already starting to move in to the updated facility.

The following photos were taken on July 27.

Dimmitt Hall Remodel 7-27-15 (30 of 81)-2

Ground floor was the last of the floors to be completed.

Dimmitt Hall Remodel 7-27-15 (9 of 81)-2

With the remodel came more accessible entries throughout the building.

Dimmitt Hall Remodel 7-27-15 (11 of 81)-2

The building will now have a workout room for students to use.

Dimmitt Hall Remodel 7-27-15 (26 of 81)-2

All halls now have their final coats of paint. Third floor is a light blue, second floor is maroon, ground floor is grey, and Hidden Hall is the blue shown above.

Dimmitt Hall Remodel 7-27-15 (12 of 81)-2

The fireplace in the Informal Lounge is in.

Published in: on August 5, 2015 at 4:08 PM Comments (0)


The URI to TrackBack this entry is: https://wordpress.morningside.edu/alumninewsletter/2015/08/05/dimmitt-hall-remodel-2/trackback/

RSS feed for comments on this post.

Leave a Comment